Cut and Fill Calculator

Calculate cut and fill balance with swell and shrink factors for earthwork grading projects.

Part of the Excavation & Earthworks calculators — see all tools in this category.

Cut (Excavation)

Area to be excavated

Average depth of material to remove

Fill (Placement)

Area to receive fill material

Average depth of fill required

Soil Type

Swell: 35% | Shrink: 15%

Results

Material Balance
Export 168 m³

Surplus material to haul away

Bank Cut Volume
200.00

In-situ volume to excavate

Loose Cut Volume
270.00

After 35% swell

Bank Fill Volume
120.00

Volume of fill space

Compacted Fill Volume
102.00

After 15% shrink

How balance is calculated

Swell factor (35%) applied to cut volume for hauling estimate. Shrink factor (15%) applied to fill volume for compacted placement. Balance = Loose Cut − Compacted Fill.

How It Works

This cut and fill calculator helps you determine the material balance for earthwork grading projects. It calculates whether you will have surplus material to export or a deficit requiring imported fill.

Area-Based Approach

Enter the cut area and average cut depth, and separately the fill area and average fill depth. The calculator computes volumes for each independently before comparing them.

Swell on Cut (Bank to Loose)

Swell factor is applied to the cut volume only. When soil is excavated, it expands:

  • Loose Cut Volume = Bank Cut Volume × (1 + Swell%/100)

Shrink on Fill (Bank to Compacted)

Shrink factor is applied to the fill volume only. When soil is placed and compacted, it contracts:

  • Compacted Fill Volume = Bank Fill Volume × (1 − Shrink%/100)

Balance Formula

Balance = Loose Cut Volume − Compacted Fill Volume. A positive balance means surplus material (export needed). A negative balance means a deficit (import needed). Values within 1% of each other are considered balanced.