Concrete Formwork Calculator

Estimate selected formwork edges and stock-board purchases while keeping net contact, independent stock rounding, stake conventions and optional prices explicit.

Part of the Concrete & Masonry calculators — see all tools in this category.

Concrete formwork

Select the edges to form, then distinguish net contact and formed length from independently rounded stock-board purchases and optional costs.

Inputs

Preparing calculator controls…

Calculator controls are preparing and temporarily unavailable.
Measurement system
Measured layout edges and openings

Keep every measured edge in the layout. Include only the edges that need formwork; clear the checkbox for an opening or an unformed edge. Each included run rounds separately to whole stock boards.

Edge 1
Clear this for an opening or edge excluded from net/contact/ordered totals.
Edge 2
Clear this for an opening or edge excluded from net/contact/ordered totals.
Edge 3
Clear this for an opening or edge excluded from net/contact/ordered totals.
Edge 4
Clear this for an opening or edge excluded from net/contact/ordered totals.
Specified board stock

Enter actual stock dimensions. Courses only verify that the specified board height covers each included form height; they do not select a formwork system.

Stake input mode

Use a documented maximum spacing and end convention, or enter a manual count. This worksheet never chooses structural stake spacing.

Optional local prices
Specified concrete formwork layoutA schematic rectangular layout whose solid edges are selected formed runs and whose dashed edges are excluded. Each selected run is independently rounded to whole stock boards. It is not a formwork or structural design.Selected formwork edges — schematic, not to scaleNorth edge: 2 boardsEast edge: 2 boardsSouth edge: 2 boardsWest edge: 2 boardsEach selected run rounds independently; excluded edges are not counted. No offcut reuse or allowance is assumed.
Formwork layout quantities
Net formed length18 m
Contact area3.6 m²
Purchased board length24 m (8 boards)
Measurement diagram
Result

Current result

Purchase 8 whole formwork boards and 18 stakes.

Net formed length
18 m
Net contact area
3.6 m²
Purchased board length
24 m
Stake count
18

Net formed length and contact area measure only selected edges. Ordered boards are whole stock pieces: every selected run rounds up separately for every course, so purchased board length can exceed net length. No allowance or offcut reuse is assumed. Blank board or stake rates remain clearly incomplete price lines; zero is a valid entered price. Unselected edges, concrete, excavation, fastening, labour and delivery are outside this takeoff.

Warnings
  • Each formed run is rounded to whole boards independently; no offcut reuse or allowance is assumed.
  • Stake counts use the entered maximum spacing and both-ends convention; this is not a structural design.
Shopping list
MaterialNet needOrder quantity
User-specified formwork board18 m (ordered)24 m (ordered) (8 packs)
Optional costs

No prices entered

Cost breakdown

No prices entered. This is not a completed zero-cost estimate.

Itemized cost lines, purchased quantities, pricing states, and line taxes
LinePurchased quantity / unit / basisPricing stateDirect priceEntered line tax
Formwork boards8 count (ordered)Not priced——
Formwork stakes18 count (ordered)Not priced——
Direct priced subtotal
$0.00
Selected contingency base
$0.00
Contingency rate
0%
Contingency amount
$0.00
Before-tax total
$0.00
Entered line tax
$0.00
Contingency tax (not entered)
$0.00
Final total unavailable — enter a price to begin the estimate
—

Missing price categories: Formwork boards, Formwork stakes.

Cost by category

No entered prices to chart.

Cost chart values
CategoryCostState
Formwork boardsNot pricednot-priced
Formwork stakesNot pricednot-priced

How it works and assumptions

Enter every measured edge, select only the edges to form, then provide the actual board stock and course count. Each selected edge is rounded to full boards separately; entered stake spacing or a manual count stays explicit.

This is a quantity worksheet, not a formwork design. Continue with the live Specified Footing & Formwork Quantity Takeoff guide, then manually carry compatible board quantities to the Itemized Slab & Shed Base Estimate guide; neither guide transfers results or creates an exporter.

Worked example

The independent example below uses different dimensions from the C13 UAT rectangle, so it checks the rounding method without repeating the default layout.

Frequently Asked Questions