Under-Slab Membrane Calculator

Estimate a stated membrane strip layout for a rectangular slab, then see coverage, cut demand, whole-roll ordering, seam length and optional cost separately.

Part of the Concrete & Masonry calculators — see all tools in this category.

Under-slab membrane

Lay out user-specified membrane strips for a rectangular slab, then distinguish target coverage, cut demand, whole-roll purchases, tape seams, and optional local pricing.

Inputs

Preparing calculator controls…

Calculator controls are preparing and temporarily unavailable.
Measurement system
Slab coverage and strip direction
Actual roll and selected seams
If an extended strip exceeds one roll, either select this only when permitted and enter the end lap, or use a longer roll, reverse direction, or reduce the selected scope.
Optional local price
Under-slab membrane strip layoutA schematic rectangular slab coverage area divided into the entered number of membrane strips. Side laps overlap adjacent strips. Whole rolls are purchased after strip layout. This is a quantity sketch, not an installation detail.Membrane strip layout — schematic, not to scale2 strips × 6.2 m cut length; selected side laps are included once.Whole-roll order follows the selected strip layout; it does not specify a membrane system, laps, tape, or installation.
Membrane layout quantities
Net target coverage26 m²
Gross strip-cut area27.3 m²
Purchased whole-roll area44 m² (2 rolls)
Measurement diagram
Result

Current result

Purchase 2 whole membrane rolls.

Net target coverage
26 m²
Gross strip-cut area
27.3 m²
Purchased membrane
44 m²
Selected tape seams
6.2 m

Net coverage is the extended slab footprint. Gross cut area includes full-width strips and the entered side lap once; it is not the purchase quantity. Whole-roll stock rounds the strip layout up, so purchased area can exceed cut demand. The tape length follows only the selected seam policy. A blank roll price is an incomplete, unpriced line—not a zero-cost quote. Tape, accessories, labour and every installation scope remain excluded unless separately measured and quoted.

Warnings
  • End joins are disabled; a strip longer than one roll is rejected.
  • This is a user-specified quantity layout, not a membrane-system, lap, tape, or suitability specification.
Shopping list
MaterialNet needOrder quantity
User-specified under-slab membrane roll27.3 m² (ordered)44 m² (ordered) (2 packs)
Optional costs

No prices entered

Cost breakdown

No prices entered. This is not a completed zero-cost estimate.

Itemized cost lines, purchased quantities, pricing states, and line taxes
LinePurchased quantity / unit / basisPricing stateDirect priceEntered line tax
Under-slab membrane rolls2 count (ordered)Not priced——
Direct priced subtotal
$0.00
Selected contingency base
$0.00
Contingency rate
0%
Contingency amount
$0.00
Before-tax total
$0.00
Entered line tax
$0.00
Contingency tax (not entered)
$0.00
Final total unavailable — enter a price to begin the estimate
—

Missing price categories: Under-slab membrane rolls.

Cost by category

No entered prices to chart.

Cost chart values
CategoryCostState
Under-slab membrane rollsNot pricednot-priced

How it works and assumptions

Enter the measured slab, the selected edge extension, actual roll dimensions, stated side lap and strip direction. The calculator expands the target footprint, lays full-width overlapping strips across it, and rounds the resulting strip layout to whole rolls.

This is a quantity worksheet, not a vapor-barrier specification. Continue with the live Mesh & Under-Slab Membrane Layout guide, then manually record compatible whole-roll quantities in the Itemized Slab & Shed Base Estimate guide; neither guide transfers results or creates an exporter.

Worked example

The independent example below uses different dimensions and stock from the default C14 UAT values, so it checks strip and whole-roll rounding without repeating the starting layout.

Frequently Asked Questions