Concrete Removal & Demolition Calculator

Turn measured slab dimensions or a direct solid volume into a transparent debris, mass, load, and optional-cost estimate—without assuming a universal density or rubble factor.

Part of the Excavation & Earthworks calculators — see all tools in this category.

Concrete removal estimate

Measure solid concrete, then plan broken debris volume, payload-limited loads, and optional local costs.

Inputs
Measurement units
Quick estimate

Measure one basic slab section. The default debris, haul, and payload assumptions produce a planning estimate until you refine them.

Rubble, haul, payload, and local costs

Confirm project-specific debris and hauling assumptions, then add optional local rates.

Optional inputs not included: Density, Rubble expansion, Haul container, Payload limit, Local costs.

Additional slab sections and geometry

Add separately measured slabs, or switch to a direct solid-volume takeoff when dimensions are unavailable.

Optional refinement inputs are not included in this estimate.

Solid slab volume

6.54 yd³ solid

Broken rubble volume

9.81 yd³ loose

Equivalent mass: 26,455 lb (13.23 US short tons)

Load comparison

Volume limit
2 loads
Payload limit
2 loads

Controlling constraint: both volume and payload.

Measurement diagram
Result

Current result

Plan 2 loads.

Solid concrete
6.54 yd³ solid
Estimated mass
26,455 lb
Loose rubble
9.81 yd³ loose
Controlling limit
both
Warnings
  • Rubble expansion changes disposal volume only; estimated concrete mass remains based on solid volume.
  • This concrete debris factor is not a soil swell factor.
  • Rebar, contaminants, and mixed waste require separately entered project-specific adjustments; this estimate does not imply an exact mixed-waste weight.
Optional costs

No prices entered

Cost breakdown

No prices entered. This is not a completed zero-cost estimate.

Itemized cost lines, purchased quantities, pricing states, and line taxes
LinePurchased quantity / unit / basisPricing stateDirect priceEntered line tax
Disposal26,455 lb (net)Not priced——
Haulage2 count (ordered)Not priced——
Demolition538.2 ft² (net)Not priced——
Direct priced subtotal
$0.00
Selected contingency base
$0.00
Contingency rate
0%
Contingency amount
$0.00
Before-tax total
$0.00
Entered line tax
$0.00
Contingency tax (not entered)
$0.00
Final total unavailable — enter a price to begin the estimate
—

Missing price categories: Disposal, Haulage, Demolition.

Cost by category

No entered prices to chart.

Cost chart values
CategoryCostState
DisposalNot pricednot-priced
HaulageNot pricednot-priced
DemolitionNot pricednot-priced

Sources

How it works and assumptions

Measure the existing concrete as solid material first. Broken concrete occupies more container space, but its estimated mass remains tied to the solid volume and the density you enter.

Plan from the higher of the volume-limited and payload-limited load counts. Confirm local payload limits, container fill restrictions, rebar handling, and disposal acceptance with the hauler and receiving facility.

Sources and revision

Page revision: 2026-10-12