Total area to be covered
Common depths: 50-150mm
1.0 = no compaction, 1.2 = typical compaction
Typical waste is 5-15% for aggregate
Optional: material cost per cubic meter
Optional: material cost per tonne
Results
With compaction & waste
Total weight to order
Without adjustments
Material density